List view
Facility Design Process
Facility Design Process
Design Guides
Design Guides
01.0 Arrival
01.0 Arrival
02.0 Administration
02.0 Administration
03.0 Retail
03.0 Retail
04.0 Lockers/Changing
04.0 Lockers/Changing
4.0 Lockers & Changing
4.01 Sightline Vestibule
4.02 Issue/Storage
4.03 Attendant Station
4.04 Housekeeping/Janitor Closet
4.05 Lockers
4.06 Private Changing Room
4.07 Towel Station
4.08 Sinks & Wet Grooming
4.09 Dry Grooming
4.10 Showers
4.11 Toilet Compartment
4.12 Urinals
4.14 Waiting Lounge
4.13 Swimsuit Extractor
4.15 Waiting Hospitality Station
05.0 Relaxation Spaces
05.0 Relaxation Spaces
06.0 Indoor Amenities
06.0 Indoor Amenities
6.0 Indoor Amenities
6.1 Wet Lounge
6.2 Experience Showers
6.3 Steam Room
6.4 Sauna
6.5 Snow Cabin
6.6 Ice Fountain
6.7 Aromatherapy Inhalation Room
6.8 Halotherapy
6.9 Herbal Baths
6.10 Rhassoul
6.11 Hammam
6.12 Hammam Scrub Room
6.13 Plunge Pools
6.14 Sensory Deprivation Rooms
6.15 Reflecting Pool
6.16 Indoor Kneipp Walk
6.17 Herbal Baths
07.0 Spa Treatment Rooms
07.0 Spa Treatment Rooms
7.0 Spa Treatment Areas
7.1 Standard Massage Room
7.2 Multi-Use Treatment Room
7.3 Skincare/Waxing Room
7.4 Couples (Duet) Treatment Room
7.5 Wet Treatment Room
7.6 Vichy Shower Room
7.7 Scrub Room
7.8 Hydrotherapy Room
7.9 Multi-Purpose Treatment Suite
7.10 Advanced Beauty Cabins
7.11 Specialty Treatment Room
7.12 Single Treatment Suite
7.13 Duet Treatment Suite
7.14 Satellite Treatment Pod (single)
7.15 Satellite Treatment Pod (duet)
7.16 Specialty Treatment Suite
Spa Dispensary
08.0 Regenerative Medicine
08.0 Regenerative Medicine
8.0 Regenerative Medicine
8.1 Arrival (RM)
8.2 Seating (RM)
8.3 Restrooms (RM)
Apothecary
8.5 Apothecary Prep & Dispensary
8.6 Apothecary Lounge
RM Dispensary
Housekeeping / Janitor
Records and Copy Room (RM)
Product/Supply Storage (RM)
Copy Room and Records (RM)
Work Stations (RM)
Demonstration Space
Diagnostic Room
Acute Care
Medical Treatment Room
Medical Exam Room
Conference / Group Consultation Space
Consultation Room
IV Terrace/Garden
IV Prep
IV Lounge
09.0 MedSpa
09.0 MedSpa
10.0 Beauty Salon
10.0 Beauty Salon
11.0 Barber/Men’s Salon
11.0 Barber/Men’s Salon
12.0 Spa Culinary
12.0 Spa Culinary
13.0 Support
13.0 Support
13.0 Support
Staff Workspace
Other Mechanical Rooms
Staff Lockers
Janitor/Housekeeping
General Storage
Supervisors Workstations
Product Storage (Secured)
Staff Restroom
Linen Storage
Soiled Linen Cart Staging
Clean Linen Cart Staging
Staff Lounge
Therapist training room
Telephone/Audio/Server Room
Mechanical / Electrical Room
14.0 Fitness
14.0 Fitness
14.0 Fitness
Mind-Body Studio
Physical Therapy Area
Strength Training
Support Staff Office/Work Area
Recovery Area
Stretching Area
Back of House Storage
Restroom(s)
Hospitality Station
Studio Storage
Large Group X Studio
Small Group X Studio
Functional Studio
Personal Training Space
Cardio Training
Fitness Diagnostics
Fitness Trainers Office
Fitness Director Office
Arrival/check-in
15.0 Outdoor Fitness
15.0 Outdoor Fitness
16.0 Outdoor Thermal Amenities
16.0 Outdoor Thermal Amenities
17.0 Landscape
17.0 Landscape
1.0 Pre-Launch - 01 Documentation
1.0 Pre-Launch - 01 Documentation
1.0 Pre-Launch - 02 DLC Partners & Stakeholders
1.0 Pre-Launch - 02 DLC Partners & Stakeholders
1.0 Pre-Launch - 03 Site Audit & Survey
1.0 Pre-Launch - 03 Site Audit & Survey
1.0 Pre-Launch - 04 Systems & Processes
1.0 Pre-Launch - 04 Systems & Processes
18.0 Other Wellness Associated
18.0 Other Wellness Associated
19.0 Circulation
19.0 Circulation
2.0 Launch
2.0 Launch
2.0 Launch - 01 Presentations & Proposals
2.0 Launch - 01 Presentations & Proposals
2.0 Launch - 02 Menus & Marketing Material
2.0 Launch - 02 Menus & Marketing Material
2.0 Launch - 03 Vendor Forms & Information
2.0 Launch - 03 Vendor Forms & Information
2.0 Launch - 04 SOPs & Protocols
2.0 Launch - 04 SOPs & Protocols
2.0 Launch - 05 Staffing & Onboarding
2.0 Launch - 05 Staffing & Onboarding
2.0 Launch - 06 Operational Systems & Software
2.0 Launch - 06 Operational Systems & Software
3.0 Active Operations
3.0 Active Operations
3.0 Active Operations - 01 Documentation
3.0 Active Operations - 01 Documentation
3.0 Active Operations - 02 Vendors Inventories & Quotes
3.0 Active Operations - 02 Vendors Inventories & Quotes
3.0 Active Operations - 03 Menus Brochures & Printed Collateral
3.0 Active Operations - 03 Menus Brochures & Printed Collateral
3.0 Active Operations - 04 SOPs & Protocols
3.0 Active Operations - 04 SOPs & Protocols
3.0 Active Operations - 05 Staffing
3.0 Active Operations - 05 Staffing
3.0 Active Operations - 06 Operational Equip. & Programs
3.0 Active Operations - 06 Operational Equip. & Programs
3.0 Active Operations - 07 Presentations & Proposals
3.0 Active Operations - 07 Presentations & Proposals
Snow Cabin
Objective
A tile lined room with a generator producing a soft, falling snow effect usually at temperatures between 7-13 degrees Celsius (45-55 degrees F).
Variations
Variation
- Ice Cabin
- The ice cabin is a variation on the Snow Cabin and consists of ice walls, ice fountains and ice block focal features.
Space Planning
Locate the snow cabin adjacent to the wet lounge and positioned with other wet amenities. This room is utilized as one of the last phases of the wet circuit.
Design Features
Features:
- Provide vapor-proof and insulated construction following the manufacturer’s installation requirements and any local building regulations.
- Install a water proof, sloped floor to a drain(s).
- Provide bench or lounge seating within the room. Benches should be heated or should include durable cushioning rated for a cold, humid environment.
- Consider heated floors so that guests may walk barefoot in the room.
- Include a focal feature within the room. This may be an ice fountain (as discussed in a separate section), snowfall shower, or other location specific feature.
- Utilize interesting materials within the room to create a memorable experience.
- Provide equipment operation and life safety signage at appropriate locations.
- Locate controls and timers in back of house space to be controlled by the employees.
- Install robe hooks outside the entrance door.
Flooring and Wall Finishes
A sloped floor to a drain(s)
Furniture and Equipment
Equipment
- Snow Generator Room: Provide an adjacent utility room and/or plenum space to remotely locate the equipment. See manufacturer’s requirements. Provide access from a back of house area for maintenance. Provide adequate acoustical separation if located adjacent to guest areas.
- Snow Generator Equipment: Specify a commercial snow generator for continual use with independent thermostat to control the room temperature. Size the generators for the Snow Cabin volume. Certain materials may require the use of a larger generator. Please consult with the manufacturer prior to purchasing the generator. Install the required, water supply, inline water softening system, a floor drain, and the necessary electrical supply. Provide blocking within the partition if the generators are wall mounted.
Acoustics
Lighting
Install wet area rated cold resistant lighting.
Temperature and Ventilation
Electrical and Technology Requirements
Wet area rated and cold resistant audio speakers
Sanitation and Safety Measures
Duress alarm or emergency shut-off
Adjacencies
Circulation
FAQs
What is the purpose of this documentation template?
This documentation template is designed to provide a comprehensive guide to help users understand and use the product. It includes detailed instructions, screenshots, and other helpful information.
How do I _________?
Answer here.